Skip to content
English - United Kingdom
  • There are no suggestions because the search field is empty.

What setup prerequisites and tools are required for installing a Verv Connect device, especially for electrical engineers?

Before installing a Verv Connect device, electrical engineers should ensure they have the correct tools and electrical setup to support a smooth and safe installation. Here's a checklist of prerequisites and required tools:

Tools Required:

  • Power drill
  • Circular hole cutting drill bit or step drill bit (20mm–25mm)
  • Multimeter
  • Phillips screwdriver
  • Standard flathead screwdriver

Electrical Requirements:

  • Ensure both live and neutral supply and an earth is available
  • For 3-phase installations, all three phases plus a neutral are required
    • Note: A three-phase motor without a neutral supply is not compatible with the Verv 3-phase smart isolator
    • Note: It is possible to run a three phase isolator as a single phase isolator by connecting to L1, Neutral & Earth

Verifying both the toolset and electrical conditions before installation will help avoid delays and ensure safety compliance during setup.